The 403 CMT Multilevel Well and Groundwater Monitoring System provides site assessors with a clearer understanding of three-dimensional groundwater slow and the distribution of contaminants in the subsurface. Monitor up to 7 zones in one 1.7â?? well, or 3 in the narrow 1.1â?? (28mm) Multilevel Well System.
This is a simple, cost-effective multilevel system which can obtain discrete zone groundwater data. It allows remediation strategies to be targeted more precisely, focussing efforts in the most effective manner.
The CMT Multilevel System makes the accurate monitoring of contaminant plumes much more affordable. It provides detailed data both vertically and horizontally. The monitoring zones can be set where needed and its single tube design allows reliable seals between zones.
There are two systems available. The 1.7â?? (43mm) polyethylene tubing which is segmented into seven channels, allowing groundwater monitoring at up to 7 depth discrete zones. The 3-Channel System uses the same material and construction but has been designed for narrow installations. This narrow tube is 1.1â?? (28mm) in diameter making it ideal for direct push where the annulus for seal placement is narrow.
Manufactured by: Solinst
Model: Solinst 403 CMT Multi-Level Well Systems
Identify vertical as well as horizontal contaminant distribution with transect monitoring
Ideal for shallow wells in high water table environments
Multilevel water sampling and level monitoring in unconsolidated soils or bedrock
Dewatering impact assessments at construction and mining sites
Mass transport calculations and mass flux estimation
Monitoring of natural attenuation or remediation processes, and documentation of its effectiveness
VOC, MTBE and Perchlorate monitoring at NAPL sites
Determination of the best location for reactive barrier walls, the Waterloo Emitter and other remediation methodologies
Vapour monitoring with special wellhead seals
Helps optimise design and performance assesment of remedial options
One CMT System - Two Sizes | |||
---|---|---|---|
Features | 7 Channel | 3 Channel | |
Material | *MDPE | *MDPE | |
Tubing Diameter | 1.7" (43 mm) | 1.1" (28 mm) | |
Monitoring Zones | Up to 7 | Up to 3 | |
Channel Diameter | 6 - Outer pie channels: nominal 0.4" (10 mm) 1 - Center hex channel: nominal 3/8" (9.5 mm) |
3 - Hex channels: nominal 3/8" (9.5 mm) | |
Channel Volume | 40 mL/ft. 30 mL/ft. (center) | 30 mL/ft. | |
Installation Options** | Sand & bentonite backfill Natural formation collapse |
Bentonite & sand cartridges Sand & bentonite backfill Natural formation collapse |
|
Coil Lengths*** (Coil 4 ft. dia.) |
100 ft. (30 m), 200 ft (60 m) & 300 ft. (90 m) | 100 ft (30 m), 200 ft (60 m) & 500 ft (150 m) | |
Tubing temperature during installation | –15ºC to +35ºC **** | Port plug temperature during installation | +15°C to +35°C |
Pressure differential (water levels) | 12.5 inch-pounds torqued port plugs are designed to hold 20 psi (50 ft) of head differential. |
Notes | * Tubing is MDPE; proprietary mix of HDPE and LDPE products. |
** Avoid using 'single lifts' of grout, greater than 50 ft in the unsaturated zone. | |
*** Each CMT coil measures 1 to 2 ft longer than stated. | |
**** If air temperature is above +35°C, use cold water to cool down the tubing at the port before installing the port plug. |
How many zones do you wish to monitor?
What is the type, total depth and diameter of the borehole?
What are you monitoring for?
What is the depth to water if you are collecting samples for analysis?
How many installations are you considering?